412-plot regeneration scheme retires the signing-in book

A London developer running four concurrent phases replaced paper inductions across 38 subcontractor companies in six weeks.

Sites
4 phases
Operatives
1,240
SC companies
38
Rollout
6 weeks

The challenge

  • Inductions ran gate-side on a laptop, creating 40-minute queues every Monday morning.
  • Headcount came from a paper book that nobody trusted during an evacuation.
  • Client reporting was rebuilt by hand in a spreadsheet each week.

What we did

  • One master induction plus phase-specific versions, published with change notes.
  • QR posters at every gate so operatives complete the induction before they travel.
  • Two kiosk tablets per gate for sign-in with photo capture.
  • Scheduled 06:00 branded report pack to the client's project director.

Results

-78%

Time from arrival to working

5m 12s

Average roll-call muster

100%

Sign-ins with photo evidence

14 hrs

Admin time saved per week

“The first evacuation drill after go-live took five minutes instead of twenty-two. That alone paid for the year.”
Project Director · Tier 1 residential developer